İletişim

  • YTÜ Yıldız Teknik Üniversitesi Davutpaşa Kampüsü Yıldız Teknopark, A1 Blok, Kat -1, Smartnet Ofisi, Esenler-İstanbul/Türkiye
  • 0(553) 328 81 69
  • info@smartnet.global

Smartnet projesinin çıktı, rapor ve diğer belgelerine bu sayfadan ulaşabilirsiniz.

Başlangıç

A.0.3 Preliminary Analysis of Current Situation -TNA_Training Needs Analysis Report

Aktivite 1

A.1.1.1 Requirements Lifecycle Management - Needs analysis and assessment_Sofware Requirement Specifications (SRS) and Database Design Document (DDD)
A.1.1.1 Requirements Lifecycle Management - Needs analysis and assessment_Test Specifications (TS) Document
A.1.1.2 Technical Design - Designing the software _Sofware Design Descriptions (SDD)
A.1.1.3 Implementation - Application development_Preliminary User Guide for Entrepreneurs and Mentors (P-UG)
A.1.1.4 Testing - Data entry and testing_Penetration Test Plan (PENTEST-P) and Results (PENTEST-R)
A.1.1.4 Testing - Data entry and testing_Test Plan (TP) - Alpha and Beta Tests - Alpha Test Results (ATR) - Beta Test Results (BTR)
A.1.1.5 Training - Delivery of trainings_System Admin Manual and Public Portal Admin Manual (Turkish and English)
A.1.1.5 Training - Delivery of trainings_Training Manual and Material for System Admin and Public Portal Admin (English)
A.1.1.5 Training - Delivery of trainings_Training Manual and Material for System Admin and Public Portal Admin (Turkish)
A.1.1.5 Training - Delivery of trainings_Training Manual for User (English)
A.1.1.5 Training - Delivery of trainings_Training Manual for User (Turkish)
A.1.1.5 Training - Delivery of trainings_Training Plan Document (TPD)
A.1.1.6 Release - Deployment of application_System Integration (SI) and Deployment Report (DR)
Activity A.1.1. Development of TTI Network Software Platform_Acceptance Test Plan (ATP) and Acceptance Test Results (ATR)
Activity A.1.1. Development of TTI Network Software Platform_Handover Document (HD)
Activity A.1.1. Development of TTI Network Software Platform_Maintenance Plan Document (MP) and the Help Desk Platform (HD)
Activity A.1.1. Development of TTI Network Software Platform_Smartnet Platform Acceptance Testing Sign-Off Document

Aktivite 3

A.3 Developing Project Communication Strategy
A.3.1_Launch Event Press Releases.zip
A.3.1_Launch Event Report
A.3.3.1 Development of Project Identity

Aktivite 4

A.4 SMARTNET_SCM 1_Meeting Presentation and Photos_27.10.2022
A.4 SMARTNET_SCM 2_Meeting Presentation and Photos_31.01.2023
A.4 SMARTNET_SCM 3_Meeting Presentation and Photos_16.06.2023
A.4 SMARTNET_SCM 4_Meeting Presentation and Photos_13.10.2023
A.4 SMARTNET_SCM 5_Meeting Presentation and Photos_30.04.2024
A.4 SMARTNET_SCM 6_Meeting Presentation and Photos_06.08.2024